Skip to content
Howaty

Howaty

Enjoy life, Inspiring work

About Us

  • Sports
  • Politics
  • Technology
  • Fashion
  • Health
  • LayoutShow sub menu
    • Left Sidebar
    • Right Sidebar
    • No Sidebar Full Width
    • No Sidebar Content Centered
  • Contact

Tag: FEPEC

Chinese-built 1st transmission line of Bangladeshi power grid network strengthening project put into operation

wangxiao02/10/20240

DHAKA, Feb. 9 (Xinhua) — The Chinese-built 1st transmission line of Power Grid Upgrading and Renovation Turnkey Project in Bangladesh has been put into operation, boosting the transmission capacity o

Premium Themes

More Free Themes

Copyright © 2025 Howaty.
Proudly powered by WordPress | Theme: Apace by ThemezHut.