This wind turbine blade is 75 meters long and weighs 19 tons. There are dozens of bends on this hillside road. It takes two weeks to transport a blade to the top of this cliff.
Workers need to overcome extreme cold and altitude sickness as well as heavy storms and snow.
(Produced by Gao Yuand and Dong Feng)